by David Porter | Sep 3, 2026
Attention: The bid date pushed to 10/8/26, and Addendum 01 and revised drawings have been uploaded. The bid date pushed to 9/18/26.
by David Porter | Sep 3, 2026
Attention: We are bidding the HVAC and medical gas scopes only, not the plumbing. And the medical gas equipment is being provided and installed by the dental equipment provider. There are no other specifications than what are on the drawings....
by David Porter | Aug 13, 2026
Attention: For the DOAS units, DOAS-1 is the basis of design CaptiveAire unit listed on the equipment schedule on sheet M204 and DOAS-2 is the basis of design AAON unit on the equipment schedule on sheet M001. New mechanical drawings have been uploaded. We are no...
by David Porter | Aug 13, 2026
Attention: Bid date changed! The only specifications provided for this project are in the drawings.