Attention:
For the DOAS units, DOAS-1 is the basis of design CaptiveAire unit listed on the equipment schedule on sheet M204 and DOAS-2 is the basis of design AAON unit on the equipment schedule on sheet M001.
New mechanical drawings have been uploaded. We are no longer pursuing the plumbing scope of work.
