by David Porter | Jun 23, 2025
Attention: Permit drawings and updated specifications have been uploaded. I don’t see any significant changes, but please look over these new documents for any changes that need to be made to the equipment, materials, and/or scope of work that you...
by David Porter | Jun 12, 2025
Attention: Addendum 01 has several revised drawings and the changes include adding a circulation pump.
by David Porter | Jun 5, 2025
Attention: There are revised plumbing and mechanical drawings in Addendum 02, and it changes the spec on domestic water piping insulation to fiberglass.
by David Porter | May 30, 2025
Attention: Addendum 01 does contain revised mechanical drawings. Addendum 02 changes the bid date.
by David Porter | May 27, 2025