Attention:

Addendum 04 has been added and there are drawing and specification revisions.  The bid date did not change.

Addendum 03 has been added extending the bid date.

Addendum 02 has been added and it does include revised plumbing and mechanical drawings.

The GC’s bid form requires their pricing to be broken out by building, so I need you to do the same.  There are no drawings uploaded for Building 5: Covered Vehicle and Equipment Storage because there is no plumbing or mechanical scope for that building.

Addendum 01 was updated to include the applicable drawings.