Attention:

The information in the Clarifications just added was previous relayed through Addenda, except Clarification 05 which answers questions raised since Addendum 03 was issued.

The preliminary schedule has been uploaded to make everyone aware that almost no major purchases will be made for at a year from now.  So, quote accordingly.

We were informed that the revised equipment schedule that was part of Addendum 03 had an error, so use the new one that was just uploaded.

The bid date has officially ben changed to 12/4/25, but I am requesting quotes by EOB 12/3/25.

Addendum 03 was revised to include a summary as well as revised drawings.  The revised drawings include updated mechanical equipment schedules.

Addenda 01-03 have been added.  Addendum 01 contains many revised mechanical drawings.  Addendum 02 adds some mechanical preferred alternates and approved manufacturers on equipment and controls.  Addendum 03 contains a list of the specification changes that have been made.  The revised specifications are those now uploaded.