Attention: Mechanical Vendors, Subcontractors and Manufacturer Representatives,
Please quote all equipment and materials on drawing M1.1 as the Base Bid and all equipment and materials on M1.2 and ADD Alternate 1.
Thank you!
Attention: Mechanical Vendors, Subcontractors and Manufacturer Representatives,
Please quote all equipment and materials on drawing M1.1 as the Base Bid and all equipment and materials on M1.2 and ADD Alternate 1.
Thank you!