| 09-5342 |
00/00/00 |
MECHANICAL MACC MASTER SPEC - All Projects are bound to these specifications and should be used in conjunction with the project specifications, Camp Lejeune / Cherry Point |
MASTER SPECIFICATION |
|
| 5026720 |
7/22/2010 @ 2:00 |
INSTALL HVAC SYSTEM U.S ARMY VETERINARIANS OFFICE, BLDG 293 - MECHANICAL MACC PROJECT - CCD 120 DAYS CHERRY POINT, NC |
DRAWINGS SPECIFICATIONS |
|
| 5051122 |
7/23/2010 @ 2:00 |
MODIFICATION TO HVAC SYSTEM B-4472 - MECHANICAL MACC PROJECT - CCD 60 DAYS - A ONE TIME SITE VISIT WILL BE CONDUCTED 7/6/2010 @ 9:00, MEET @ THE CHERRY POINT ROICC OFFICE CHERRY POINT, NC |
SCOPE OF WORK |
AMENDMENT 1 AMENDMENT 1 DRAWINGS |
| 10-0129 |
7/28/2010 @ 10:00 |
Sanitary Sewer Installation, CHB - Mechanical MACC Project - CCD 90 Days Camp Lejeune, NC |
Specifications Drawings |
|
| 5498393 |
8/03/2010 @ 2:00 |
REPLACE REFRACTORY AROUND TUBES IN FIREBOX # 2 BOILER, CENTRAL HEAT PLANT B-152 - MECHANICAL MACC PROJECT - CCD 60 DAYS - A ONE TIME SITE VISIT WILL BE CONDUCTED ON 7/27/2010 @ 9:00 CHERRY POINT, NC |
SCOPE OF WORK |
|
| WR5017923 |
Awaiting Results |
Replace HVAC Bldg 87 - Mechanical MACC Project - CCD 45 Days Cherry Point, NC |
Drawings Scope of Work |
Amendment 1 Amendment 2 Amendment 2 (Tile Drawing) Amendment 2 (Panel Location) |
| 4910317 |
Awaiting Results |
Replace Air Dryer Systems B-4380 - Mechanical MACC Project - CCD 90 Days Cherry Point, NC |
Scope of Work |
|
| 10-5310 |
Awaiting Results |
DESIGN BUILD P1269 FIELD TRAINING FACILITY @ CAMP DEVIL DOG CAMP LEJEUNE, NC |
Solicitation Sketches RFP Part 1 RFP Part 2 |
|
| 10-5306 |
Awaiting Results |
DESIGN BUILD P1268 SOI EAST FACILITIES @ CAMP GEIGER CAMP LEJEUNE, NC |
RFP |
Amendment 3 Amendment 4 Amendment 5 Amendment 6 |
| WO5183146 |
Awaiting Results |
REPLACE HVAC B4505 - MECHANICAL MACC PROJECT - CCD 120 DAYS - A ONE TIME SITE VISIT WILL BE CONDUCTED ON 5/20/2010 @ 9:00 CHERRY POINT, NC |
Specifications Drawings |
AMENDMENT 1 |
| 5169134 |
Awaiting Results |
REPLACE PUMPS & CONTROLS, LIFT STATION B-4188 - MECHANICAL MACC PROJECT - CCD 120 DAYS - A ONE TIME SITE VISIT WILL BE CONDUCTED ON 6/9/2010 @ 1:00, MEET AT THE ROICC OFFICE CHERRY POINT, NC |
SCOPE OF WORK |
|
| 5522448 |
Awaiting Results |
REPAIR PISTA GRIT SYSTEM # 2 SEWER TREATMENT PLANT, B-4376 - MECHANICAL MACC PROJECT - CCD 30 DAYS - A ONE TIME SITE VISIT WILL BE CONDUCTED ON 6/24/2010 AT 9:00, MEET AT THE ROICC OFFICE. CHERRY POINT, NC |
SCOPE OF WORK |
AMENDMENT 1 |
| 5017960 |
Awaiting Results |
REPLACE COMPUTER ROOM HVAC UNITS, B-4305 - MECHANICAL MACC PROJECT - CCD 120 DAYS CHERRY POINT, NC |
SCOPE OF WORK |
AMENDMENT 1 |