Project Bids

Job Number
Bid Date
Title & Location
Drawings & Specs
Amendments
09-5342
00/00/00
MECHANICAL MACC MASTER SPEC - All Projects are bound to these specifications and should be used in conjunction with the project specifications,
Camp Lejeune / Cherry Point
MASTER SPECIFICATION
 
 
CM0214
2/14/2012 @ 2:00
UNCW Wagoner Dining Hall Renovations - CM@Risk Bid
Wilmington, NC
   
WO 6076315
2/16/2012 @ 2:00
Replace 4 Fire Hydrants, Various Locations - Mechanical MACC Project - CCD 60 Days - A on-time site visit will be conducted on Feb. 8th @ 9:00, meet at ROICC Ofiice.
Cherry Point, NC
RFP
 
 
120027
2/22/2012 @ 1:00
HVAC Repairs, Bldg AS1000 - Mechanical MACC Project - CCD June 1st. A site visit will be conducted on Feb. 8th at 1:00, meet at main conference room in Bldg AS214.
Camp Lejeune, NC
Drawings
Reference Drawings
SPECS
RFP
 
 
5484178
2/22/2012 @ 2:00
Replace Sanitary Pump Station #897 - Mechanical MACC Project - CCD 210 Days - A One-Time site visit will be conducted on 1/24/2012 @ 9:00, meet at ROICC Office.
Cherry Point, NC
RFP
SPEC
Drawings
 
 
WR5017923
Awaiting Results
Replace HVAC Bldg 87 - Mechanical MACC Project - CCD 45 Days
Cherry Point, NC
Drawings
Scope of Work
 
Amendment 1
Amendment 2
Amendment 2 (Tile Drawing)
Amendment 2 (Panel Location)
 
5169116
Awaiting Results
REPLACE CHAIN FLYTES ON PRIMARY CLARIFIER, INDUSTRIAL WASTE TREATMENT PLANT, BLDG 1005 - MECHANICAL MACC PROJECT - CCD 60 DAYS - A ONE-TIME site visit will be conducted for this project on 31 May 2011
CHERRY POINT, NC
RFP
 
 
12-0064
Awaiting Results
Replace Suction Lines at Dental Clinic Bldg 460 - Mechanical MACC Project - CCD 60 Days
Camp Lejeune, NC
Drawings
SOW
RFP
 
 
WO 6007778
Awaiting Results
REPAIR HAVC B-93 - MECHANICAL MACC PROJECT - CCD 60 DAYS
CHERRY POINT, NC
RFP
SOW
 
 
12-0406
Awaiting Results
Replace The Midway Park Feeder Breaker In Substation Number Two - Mechanical MACC Project - CCD 180 Days
Camp Lejeune, NC
RFP
SOW
Substation
Attachment A
 
Amendment 1
Amendment 2
 
12-0403
Awaiting Results
Generator #1 & Associated Equipment Replacement, H1 - Mechanical MACC Project - CCD 120 Days
Camp Lejeune, NC
RFP
SOW
Site Map
Asbestos Report 1E
Asbestos Report Crawl Space
Attachment A
Attachment B
Attachment C
 
Amendment 1
Amendment 2
 
WR 5963625
Awaiting Results
Replace Deaerating Tank Heater at B-152 - Mechanical MACC Project - CCD 120 Days
Cherry Point, NC
RFP
 
 
10-0224
CANCELLED
Repair BEQ Bldg M430 - Mechanical MACC Project - CCD 1 June 2013 - Contractor may not have access to the building until 1 March 2012 -FY12 Straddle Project
Camp Lejeune, NC
Spec
Drawings Part 1
Drawings Part 2
Bid Sheet